Experiences, new impressions as well as suggestions of guests, guides and crew – all these aspects were implemented during the building of M/Y GOLDEN DOLPHIN II which started the first safari April 2006.
Dive deck and platform gives divers enough space to prepare for diving. 10 comfortable cabins with private bathroom, air condition and Minibar. The huge salon with TV/Music, computer and bar corner plus 2 sun decks guarantee pure relaxing between the dives!
All routes are available. Special trips on request.
Year built: | 2005/2006 |
Length: | 38 metres |
Beam: | 8 metres |
Cabins: | 10 double cabins with AC, minibar private bathroom; 8 twin cabins on the lower deck, 2 cabins with king-size bed on the upper deck |
Salon: | spacious saloon with AC - bar, dining room, TV and computer corner with DVD, Video and sound system |
Decks: | 1 dive deck with platform, 2 sun decks |
Water: | 1 desalination system, 16 t per day |
Engines: | 2 x Cummins K19, each 750 HP |
Generators: | 2 x 80 kW (230 V) Perkins |
Compressors: | 2 x L & W 280 EC; 1x Mattei LP ERC 507l |
Connectivity: | VHF, DSC (Area I and II), Satellite EPIRB, Satellite phone, WIFI |
Tanks: | 12l aluminum-tanks DIN/INT, 15l tanks on request |
Zodiac: | 2 zodiacs with outboard engine |
Safety: | Life jackets and 2 life rafts, oxygen and first aid, fire extinguishers in every cabin and in salons, fire fighting and alarm system, smoke detectors |